Pressure Process Training

Home Pressure Process Training

Pressure Process Training

Model No: EPC-09

The main parts of the Pressure Process Training system are:

  • Reservoir.
  • Three-speed pump.
  • Industrial controller with auto-tune.
  • Pneumatic control valve.
  • Pressure accumulator.
  • Two-channel chart recorder.
  • Current-to-pressure (IP) converter.
  • Gauge pressure transmitter.
  • This alters the pressure in the accumulator. 
  • To perform experiments, students fill the reservoir with clean water and prime the system. 
  • They then set the controller to regulate the flow of water using a pneumatic valve. 
  • A pressure transmitter measures the accumulator pressure and gives feedback to the controller.